Address | 2001 Blake Street |
---|---|
Location | Denver, Colorado |
Coordinates | 39°45′22″N 104°59′39″W / 39.75611°N 104.99417°W / 39.75611; -104.99417 |
Public transit | RTD: A B G N E W at Denver Union Station |
Operator | Colorado Rockies Baseball Club Ltd.[1] |
Capacity | 46,897 (50,144 with standing room) (2018–present)[2] 50,398 (2012–2017)[3] 50,490 (2011) 50,445 (2001–2010) 50,381 (1999–2000) 50,200 (1995–1998) |
Record attendance | 51,267 (1998 MLB All-Star Game) |
Field size | Left Field – 347 feet (106 m) Left-Center – 390 feet (119 m) Center Field – 415 feet (126 m) Right-Center – 375 feet (114 m) Right Field – 350 feet (107 m) Backstop – 56 feet (17 m) |
Surface | Kentucky Bluegrass/Perennial Ryegrass |
Construction | |
Broke ground | October 16, 1992 (October 16, 1992) |
Opened | April 26, 1995 (April 26, 1995) |
Construction cost | US$300 million ($600 million in 2023 dollars[4]) |
Architect | HOK Sport (now Populous) |
Project manager | CMTS, Inc.[5] |
Structural engineer | Martin/Martin, Inc.[6] |
Services engineer | M-E Engineers, Inc.[7] |
General contractor | Mortenson/Barton Malow[6] |
Main contractors | LPR Construction[8] Havens Steel[6] Zimmerman Metals[6] Zimkor Industries[6] LPR Erectors[6] |
Tenants | |
Colorado Rockies (MLB) (1995–present) |
Address | 2001 Blake Street |
---|---|
Location | Denver, Colorado |
Coordinates | 39°45′22″N 104°59′39″W / 39.75611°N 104.99417°W / 39.75611; -104.99417 |
Public transit | RTD: A B G N E W at Denver Union Station |
Operator | Colorado Rockies Baseball Club Ltd.[1] |
Capacity | 46,897 (50,144 with standing room) (2018–present)[2] 50,398 (2012–2017)[3] 50,490 (2011) 50,445 (2001–2010) 50,381 (1999–2000) 50,200 (1995–1998) |
Record attendance | 51,267 (1998 MLB All-Star Game) |
Field size | Left Field – 347 feet (106 m) Left-Center – 390 feet (119 m) Center Field – 415 feet (126 m) Right-Center – 375 feet (114 m) Right Field – 350 feet (107 m) Backstop – 56 feet (17 m) |
Surface | Kentucky Bluegrass/Perennial Ryegrass |
Construction | |
Broke ground | October 16, 1992 (October 16, 1992) |
Opened | April 26, 1995 (April 26, 1995) |
Construction cost | US$300 million ($600 million in 2023 dollars[4]) |
Architect | HOK Sport (now Populous) |
Project manager | CMTS, Inc.[5] |
Structural engineer | Martin/Martin, Inc.[6] |
Services engineer | M-E Engineers, Inc.[7] |
General contractor | Mortenson/Barton Malow[6] |
Main contractors | LPR Construction[8] Havens Steel[6] Zimmerman Metals[6] Zimkor Industries[6] LPR Erectors[6] |
Tenants | |
Colorado Rockies (MLB) (1995–present) |